As the MBTA replaces track and signal equipment between Alewife and Park Street, readers say packed shuttles, gridlocked roads, and commutes that have ballooned in length. The post ‘Completely unacceptable’: Red Line riders describe hours-long commutes during shutdown appeared first on Boston.com.
Summary from source