Nepal has officially resumed its 40MW electricity export to Bangladesh following a temporary suspension caused by flood-related infrastructure damage. The power supply is being transmitted through the Indian grid as part of a regional energy cooperation agreement.
To maintain the export volume, Nepal has substituted the output from the flood-impacted Trishuli and Chilime hydropower plants with electricity generated from the Solu Khola and Kabeli B1 projects. This resumption marks the restoration of cross-border energy trade between the two nations after the recent environmental disruptions.
In-depth summary · AI, neutral