HomeWorld

POWER CORRUPTION: City Power ‘representative’ pressured Joburg couple to go post-paid, then ‘unlawfully’ reallocated prepaid meter

World 1 source 1 country 28m ago

While they were out of town, a Joburg couple was pressured into exchanging their prepaid meter to a post-paid system by a supposed City Power contractor. A year later, they received their first incorrect bill – for R60,000 – and discovered that their prepaid system was being used by someone else, on their dime.

Summary from source
Read the full story at the source Daily Maverick (ZA) · ZA