Qué falta para que entre en operación el TransMiCable de San Cristóbal en diciembre de 2026: distritó entregó detalles clave
World1 source1 country🔦 Under-reported29m ago
The district of Bogotá has announced that the TransMiCable system in San Cristóbal is scheduled to begin operations in late December 2026.
Before the cable system can officially open, TransMilenio must complete the integration and handover of the infrastructure. Additionally, the designated operator is required to finalize its operational readiness and preparation phase.