Ahead of the MotoGP Mandalika main race scheduled for Sunday, October 11, 2026, the Director of Generation Management at PLN is actively monitoring the power supply infrastructure. The oversight is being conducted through a dedicated control room to ensure the reliability and stability of electricity throughout the event.
This operational monitoring serves as a proactive measure to maintain power consistency for the international racing event. By utilizing centralized control systems, PLN aims to prevent potential disruptions and support the technical requirements of the Mandalika circuit.
In-depth summary · AI, neutral