The East Kalimantan Transportation Agency (Dishub) has confirmed that river transportation services are currently unable to reach Mahakam Ulu due to the ongoing drought. Low water levels in the Mahakam River have rendered the route impassable for standard vessels, disrupting connectivity to the region.
This disruption highlights the vulnerability of river-based logistics in East Kalimantan during dry seasons. As the river serves as a primary transport artery for the area, the suspension of services poses significant challenges for the distribution of goods and the mobility of residents in Mahakam Ulu.
In-depth summary · AI, neutral